Infrastructure - Phase II

​​​​​​​​​

Project Delivery Method:
Project Budget:
Construction Duration:
Funding Source:
Various
$42.8 million
2009 - 2018
Proposition N
 
Scope/Summary:
 
The Miramar Infrastructure project will repair, upgrade, add or improve sidewalks, surface parking, utilities, signage and landscaping to improve safety and access, and upgrade infrastructure throughout campus. 
 
Project Features:
  • Upgrade of the electrical 12kV loop
  • Solar thermal system at Ned Baumer Aquatic Center
  • Thermal Energy Storage Tank
  • Upgrade of the central plant
  • Landscape preservation plan for environmentally-sensitive vernal pool in the northwest corner of campus

Project Team:

  • Architect: NTD Architecture
  • Contractors: Pacific Rim, Stronghold Engineering, Dynalectric,
  • Mechanical Engineer: M.A. Engineering, Inc.
  • Electrical Engineer: Randall Lamb
  • Civil Engineer: R.B.F. Consulting
  • Structural Engineer: KPFF Consulting Engineers
  • Landscape Architect: Wimmer Yamada & Caughey
  • Propositions S & N Program Manager: Gafcon, Inc.
  • Campus Project Manager: James Bray, Gafcon, Inc.
  • Project Manager: Charlotte Zolezzi, Gafcon, Inc.
 

 