Cogeneration Facility

​​​​​​

​Project Delivery Method:
Project Budget:
Construction Duration:
Funding Source:
 
Design-Build
$3.6 million
2007-2008
Proposition S
 
Scope/Summary:
 
This project consisted of the construction of a cogeneration facility to enable the college to lower utility costs.
 
 
 
Project Team:
  • Designer/Builder: Chevron Energy Solutions

 

 