Sewer/Stormwater
Project Team:
Engineer: AB Engineering
Contractor: PK Mechanical
Propositions S & N Program Manager: Gafcon, Inc.
Campus Project Manager: Thomas J. Fine, CCM, JE Moore Consulting, Inc.
Construction Manager: Guy Meads, JE Moore Consulting, Inc.
Data/IT
This project provided an infrastructure “loop” around the entire campus that will allow for the installation of data cabling and fiber optic lines to support the existing campus as well as the new Proposition S & N projects being constructed on campus. This project was completed on time and within budget.
Project Team:
- Engineer: Randall Lamb
- Contractor: 3D Enterprises
- Propositions S & N Program Manager: Gafcon, Inc.
- Campus Project Manager: Thomas J. Fine, JE Moore Consulting
- Construction Manager: Guy Meades, JE Moore Consulting, Inc.
Old Skills Center Demolition
The Infrastructure Phase II project consisted of utilities upgrades throughout the campus and along the 15th St. and 16th St. corridors. The design team is now in progress with the design of the new 16th St. sewer line replacement as well as the 15th St. sewer relocation.
Project Team:
- Architect: Manuel Oncina Architect
- Contractor: Anton's Services
- Propositions S & N Program Manager: Gafcon, Inc.
- Campus Project Manager: Thomas J. Fine, JE Moore Consulting, Inc.
- Construction Manager: Guy Meades, JE Moore Consulting
Scope/Summary:
The Infrastructure Phase II project consisted of the utilities upgrades throughout the campus and along the 16th St. and 15th St. corridors. It is anticipated that numerous smaller projects will take place to support the construction of new and renovated buildings. The design team is now in progress with the design of the new 16th St. sewer line replacement as well as the 15th St. sewer relocation.