Cesar Chavez Parking Structure

​​​​​​​​

Project Delivery Method:
Project Budget:
Construction Duration:
Funding Source:
Design-Build
$9.2 million
2014-2015
Proposition S​
 
 
Scope/Summary:

Concurrent with the construction of the new classroom building, a new parking structure was constructed adjacent to the campus with 320 spaces to accommodate additional parking needs.
 
By the Numbers:
  • 3,830 yards of concrete 
  • 380 total concrete truck deliveries
  • 6,240 linear feet of paint striping in the structure
  • 4,000 square feet of rooftop level solar panels      

 Project Team:

  • Architect: RJC Architects
  • Design/Builder: PCL Construction Services
  • Structural Engineer: DCI Engineers
  • Mechanical Engineer: MA Engineers
  • Electrical Engineer: Michael Wall Engineering
  • Civil Engineer: Project Design Consultants
  • Geotechnical Engineer: Leighton Consulting, Inc.
  • Parking Consultants: Graelic, LLC
  • Propositions S & N Program Manager: Gafcon, Inc. 
  • Campus Project Manager: Scott Ellis, AECOM
     
 

 